SeaLifeSea Breeze Guide← Where to stay at the resort
The Sea Breeze sales department: +994 12 311 02 66
October 2024: the facade finishing, scaffolding by the gable

How it was built

Woodville · How it was built

Timeline

From the first clip to the pool

Compiled from the clips of Sea Breeze Real Estate and EminOfficial on YouTube and from Sea Breeze news. Each line has its own source.

24.02.2023

The first clip about the project: “Start your happy life story at Woodville!”

Source: YouTube, Sea Breeze Real Estate
27.03.2023

The start of sales. The news item says 1.44 ha and 46 two- and three-story houses, a children's playground, a recreation zone, a landscape park.

Source: a seabreeze.az news item
04.2023 — 06.2024

The construction: the clips “The construction process”, “The construction is in full swing”, “The construction progress”, “The course of the construction”.

Source: YouTube, Sea Breeze Real Estate
15.10.2024

“Woodville in full swing”: the finishing of facades, scaffolding by the roof gables.

Source: YouTube, Sea Breeze Real Estate (CC BY)
25.11.2024

“Woodville is ready for settling!”

Source: YouTube, EminOfficial
11.02.2025

“The first residents will soon settle here.”

Source: YouTube, EminOfficial
28.02.2025

“A real winter fairy tale in our Woodville!” — the quarter under snow.

Source: YouTube, EminOfficial
01.2026

Azerbaijan Design Award V: Woodville won the nomination “The landscape design of a residential environment” (a project of One to One — Architecture & Design).

Source: the seabreeze.az news item of 18.02.2026
10.06.2026

“Woodville: a summer with a pool”.

Source: YouTube, Sea Breeze Real Estate
20.07.2026

“Now leisure at Woodville comes with a new pool.”

Source: YouTube, Sea Breeze Real Estate (CC BY)

Autumn 2024

The last months of the construction

October 2024: the facade finishing, scaffolding by the gable
October 2024: the facade finishing, scaffolding by the gable
October 2024: the houses are almost ready, there are still building materials in the courtyard
October 2024: the houses are almost ready, there are still building materials in the courtyard
A facade of three houses: graphite frames, cedar cladding, panoramic windows
The finished facade: the same row of houses after the construction

Frames from the clip “Woodville in full swing” (15.10.2024, Sea Breeze Real Estate, CC BY): the facades are already clad, scaffolding still stands by the roof gables, materials lie in the courtyard.

Status

Where the quarter is now

The stateBuilt, being settled
The handover according to the documents2025 (the Sea Breeze property card)
Ready for settlingAnnounced on 25.11.2024 (an EminOfficial clip)
The first residentsAnnounced on 11.02.2025
PoolOpened in summer 2026
Checked18.09.2026

We did not find any postponements of deadlines in open sources: the only official handover date is 2025, and clips about readiness for settling appeared before it.